All positions
Project Controls

Project Controls Specialist (Level 3 & 4 – EVMS / P6 / Cost Controls)

Los Alamos, New Mexico (TA-55) – Onsite / HybridFull-Time / Contract

About the Role

McAfee Safety Analysis, Inc. (MSA) is seeking experienced Project Controls Specialists (Level 3 & 4) to support DOE projects at Los Alamos National Laboratory (LANL). This role focuses on cost, schedule, and performance management using EVMS tools in a highly regulated environment.

Key Responsibilities

  • Support and maintain Earned Value Management System (EVMS) processes
  • Develop and manage project schedules using Primavera P6
  • Perform cost estimating, tracking, and financial analysis
  • Utilize Deltek Cobra for cost control and forecasting
  • Analyze cost and schedule performance and report trends
  • Support planning, forecasting, and project reporting activities
  • Ensure alignment between cost, schedule, and scope
  • (Level 4) Provide technical guidance and oversight to project teams

Minimum Qualifications

  • U.S. Citizenship required
  • Strong experience in project controls (cost + schedule integration)
  • Hands-on experience with Primavera P6 AND Deltek Cobra (required)
  • Experience supporting EVMS-driven projects
  • Strong analytical, reporting, and problem-solving skills
  • Ability to obtain and maintain a DOE “Q” clearance

Important Requirement

Candidates must have hands-on experience with Primavera P6 and Deltek Cobra. Applications that do not meet these requirements will not be considered.

Experience Requirements

  • Level 3: 8–10 years of relevant experience
  • Level 4: 12+ years of relevant experience
  • Bachelor’s degree or equivalent experience

Preferred Qualifications

  • DOE, NNSA, or nuclear project experience
  • Experience in highly regulated or secure environments
  • Deltek Cobra administration or troubleshooting experience
  • Advanced data analysis and reporting skills

Work Environment

  • Onsite or hybrid at Los Alamos National Laboratory (TA-55)
  • High-security, project-driven environment
  • Schedule may vary by team (4x10 or 9/80)